RAIL PRECAST SPECIALIST

Full precast solutions for rail contractors — designed, manufactured and delivered before your occupation date.

Site-specific design to 300LA, full precast solutions, and delivery you can bank on — from the team ARTC and V/Line rail contractors already trust.

Rail structures aren't standard structures.

Whatever sits in the rail corridor — culverts, platforms, retaining walls, battle decks — it carries different requirements than standard civil work. The Australian Standard AS5100 bridge code specifies 300LA as the benchmark rail load, and every structure has to be engineered to it.

And the program is unforgiving. Rail work only happens inside strict occupations or track possessions — a fixed window where the line is closed. Whatever you need supplied has to align precisely to that date. Miss it, and the railway doesn't reopen on time.

That's the work Modcast is built for. As specialist manufacturers of precast rail structures — from culverts to platforms to retaining systems — we offer a full design-and-manufacture solution with guaranteed on-time delivery, because we understand your occupation date isn't a preference, it's the whole program.

 

Delivery aligned to your occupation, not the other way around.

Stock pile, just-in-time, or hybrid staging — the Modcast logistics team works with you from tender to program planning to delivery, so your occupation date is never at risk from a supply delay.
Find out how Modcast Delivers →

However you work, start here.

Ready to quote a rail project?
Request a Quote →
Designing a rail structure?
Talk to our Consultants →