Design-Assist

Designing a rail structure? Talk to our engineers.

Get standard details, load tables and constructability advice early — before your design is locked and your options run out.

Request Design Support →

Get specified in, not scrambled at tender

Most precast suppliers only enter the picture once a project is out to tender — by which point the design is locked, the culvert configuration is set, and there's little room to influence anything beyond price.

That's the opposite of Early Contractor Involvement (ECI), and it's the more expensive way to build. Bringing a precast manufacturer in during design gives you real cost certainty before a budget is locked in, the chance to simplify a design before it's costed, and an accurate read on lead times — the single biggest cause of avoidable delays when it's left to guesswork.

We've seen the difference it makes directly. On a major culvert replacement program for a top-tier contractor on the MRPV panel, the brief was to install several structures through residential streets and school access points, inside a two-week school holiday window — not achievable with a traditional cast-in-place base. Engaged early, we developed, costed and programmed a precast base solution instead, cutting install time enough to get the roads back in service inside the deadline. Engaged after the tender was awarded, on the usual timeline, it wouldn't have been possible at all.

It costs nothing to talk to us before you've finished the drawings. It can cost a great deal not to.

What we offer

  • Accurate cost and lead-time guidance during your feasibility or budget phase — before numbers are locked in
  • Transport Planning to navigate any route, access and handling issues before design is finalised.
  • Value Engineering reviews to identify and assess alternative methods to reduce cost, risk and delays.
  • Constructability reviews to ensure your design can be manufactured cost effectively.
  • Direct access to our consultants — not a call centre, not a quote portal

How it works

1. Reach out Early

Early involvement can guide design and provide the most opportunity for value engineering. 

2. Review of Scope And Opportunity Analysis

Review of early stage drawings to find opportunities to improve value and manufacturability.

3. Consultation Meetings

Meet face to face or virtually with your team to discuss ideas to enhance the design.

4. Delivery

Prepare preliminary designs and specifications for inclusion in working design documentation.

Book a design consultation.